Canrooska Stone Row CO090-00601 Lat: 51.77
Az Alt AppDec LunarDec Event EventDec Error
L top 6.04 10.78 48.64
R top 20.16 10.48 45.49
Dip 33.66 6.86 37.13
NE intersect 40.46 5.35 32.69 33.52
1st far dip c 41.00 5.28 32.36
Slope top 45.00 5.39 30.50 31.31
2nd top on slope 46.85 5.19 29.37 30.18
2nd top S basal step 47.56 4.93 28.78 29.59 Max 29.06 0.53
Dip below step 48.33 4.84 28.29 29.10 Max 29.06 0.04
S basal step 49.42 4.74 27.64 28.44 Max-1/16 28.67 -0.23
Dip before rocky top 51.47 4.38 26.23 27.03 Maj8 27.55 -0.52
1st Rocky top 52.38 4.49 25.83 26.62 Mid+1/16 25.88 0.74
Intersect notch 56.04 3.77 23.20 23.98 Mid 23.91 0.07
Intersect notch 56.05 3.77 23.19 Ssol-15 23.00 0.19
Hilltop c ish 58.80 3.94 21.79 22.56 Ssol/SXQ 22.00 -0.21
Step notch 61.59 3.43 19.75 20.52 Min8 20.27 0.25
Small notch c 63.35 3.42 18.73 19.49 SXQ+8 18.80 -0.07
Hilltop 64.38 3.44 18.14 18.90 Min 18.76 0.14
Step above dip 66.61 3.14 16.57 SXQ 16.70 -0.13
Dip (N end) 67.15 3.06 16.19
Top on slope 68.55 3.12 15.40
Top 69.47 3.11 14.84
Main dip 72.33 2.72 12.80
ROW ax top N base 75.86 2.78 10.70
ROW axial top 76.92 2.96 10.21
ROW axial dip 77.69 2.82 9.62
Next top S- S end 79.28 2.96 8.75 EQ/SXQ 8.80 -0.05
Hill N base -outcrop 91.98 3.48 1.34
Hilltop - N basal step 95.00 4.11 -0.01 EQ 0.00 -0.01
Hilltop N - rock 95.71 4.30 -0.29 EQ 0.00 -0.29
S slope - 1st dip 97.72 4.15 -1.65
S slope - 2nd dip 100.86 3.95 -3.72 EQ-8 -3.30 -0.42
S slope - S end rock 103.45 3.85 -5.37 EQ-15 -6.10 0.73
S basal step 105.59 3.36 -7.07
Top 107.33 3.32 -8.14 EQ/WXQ -8.70 0.56
Dip 110.22 2.88 -10.23
Main Dip 115.74 2.18 -14.05 WXQ+8 -14.00 -0.05
Break in hillslope 118.45 2.33 -15.46
Hilltop - cairn 122.57 3.02 -17.14
Hilltop S basal step 123.59 2.81 -17.88
Hump on ridge 125.92 2.70 -19.22 -18.42 Min -18.76 0.34
End top 127.43 2.54 -20.16 -19.35 Min+1/16 -19.15 -0.20
Slope top notch 128.73 2.23 -21.12 -20.30 Min8 -20.27 -0.03
Break ish 129.98 1.64 -22.31 -21.50
Basal dip/notch 131.40 0.86 -23.78 -22.96 Wsol -23.91 0.13
Far/local intersect dip 132.06 0.77 -24.20 -23.38 Wsol -23.91 -0.29
1st local step top 138.44 2.05 -26.03 -25.19 Mid+1/32 -24.91 -0.28
Step inside 140.22 2.11 -26.78 -25.93 Mid+1/16 -25.88 -0.05
2nd step - rock 142.51 2.56 -27.33 -26.48 Mid+3/32 -26.77 0.29
N basal step 145.17 2.70 -28.30 -27.43 Maj8 -27.55 0.12
Local top centre ish 147.97 3.07 -29.02 -28.14 Max-3/32 -28.19 0.05
Local top S end 149.26 3.09 -29.48 -28.60 Max-1/16 -28.67 0.07
South basal step 152.24 2.11 -31.50 -30.61
S basal dip 153.07 2.06 -31.83
Rocks notch 159.92 2.05 -33.85
Hump R end top 168.41 1.40 -36.29
1st bush c 180.19 0.74 -37.93
End top rock 186.77 0.60 -37.78
Far top R top 191.52 0.14 -37.73
Big top top notch 201.60 0.31 -35.32
Far dip b4 int 211.46 -0.05 -32.45
SW hill- knob 214.98 0.98 -29.95 -29.09 Max -29.06 -0.03
S basal step 215.93 1.27 -29.27 -28.41 Max-1/16 -28.67 0.26
SW hill - S end 216.32 1.44 -28.92 -28.06 Max-3/32 -28.19 0.13
SW hilltop central 217.60 1.59 -28.24 -27.38 Maj8 -27.55 0.17
Intersect dip ISH 223.29 0.79 -26.46 -25.62 Mid+1/16 -25.88 0.26
Sugarloaf lower hump 226.15 1.94 -23.97 -23.14 Wsol -23.91 -0.06
SL upper hump step 226.63 2.05 -23.64 -22.81 Wsol+8 -23.60 -0.04
Sugarloaf top trig 228.24 2.74 -22.19 -21.37 Sol/XQ -21.90 -0.29
Sugarloaf N basal dip 230.45 1.99 -21.76 -20.95 Sol/XQ -21.90 0.14
Pointy top 232.05 2.38 -20.57 -19.76 WXQ-15 -20.60 0.03
S basal step/notch 232.67 2.28 -20.34 -19.54
Top 233.83 2.45 -19.58 -18.78 Min -18.76 -0.02
Dip B4 N end top (S) 234.24 2.28 -19.52 -18.72 Min -18.76 0.04
S basal step/notch 234.61 2.29 -19.30 -18.50 Min -18.76 0.26
Ridge N end top 235.33 2.44 -18.79 WXQ-8 -18.80 0.01
Ridge N end - B dip 236.22 2.05 -18.66 WXQ-8 -18.80 0.14
Top 237.27 2.16 -17.99
Last notch 239.05 1.82 -17.31
Top S end 239.33 1.93 -17.05
Top N end 239.66 1.93 -16.88 WXQ -16.60 -0.28
Top S end 241.78 1.88 -15.72
Top N end 242.13 1.88 -15.53
Main dip 243.74 1.75 -14.73
Step base 247.18 1.91 -12.59
Step top 247.83 2.23 -11.93 WXQ+15 -11.60 -0.33
ROW axial dip 257.14 2.08 -6.50 EQ-15 -6.10 -0.40
Dip on slope 261.60 2.44 -3.48 EQ-8 -3.30 -0.18
V Dip 263.94 2.60 -1.90 EQ 0.00 -1.90
Small V notch 269.71 2.86 1.87 EQ 0.00 1.87
Next dip 273.92 2.84 4.46
Small rocky top 275.85 3.02 5.81 EQ+15 5.70 0.11
1st Hilltop 280.83 3.19 9.02 EQ/SXQ 8.80 0.22
2nd Hilltop 285.36 3.26 11.85 SXQ-15 11.60 0.25
NW dip - S end 288.44 2.65 13.20
NW dip - c rocks 289.96 2.71 14.17 SXQ-8 14.20 -0.03
NW dip - N end 291.79 2.77 15.31
Hill S end top 292.86 3.10 16.22
Hilltop 293.82 3.15 16.84 SXQ 16.70 0.14
Intersect notch 295.06 3.11 17.53 18.30 Min 18.76 -0.46
Break top rock 296.98 3.56 19.03 19.80 SXQ+8 18.80 0.23
Step top 299.36 3.94 20.74 21.51 SXQ+15 20.60 0.14
Step top 301.13 4.18 21.95 22.73 Ssol/SXQ 22.00 -0.05
Top 302.21 4.25 22.63 23.40
Dip before top 302.94 4.22 23.02 23.80 Ssol-15 23.00 0.02
Dip before top 302.94 4.22 23.02 23.80 Mid 23.91 -0.11
1st rock top 303.66 4.29 23.48 24.26 Ssol-8 23.70 -0.22
Hilltop - rock 305.12 4.35 24.34 25.13 Ssol 23.91 0.43
Top N basal step 309.73 4.04 26.57 27.37 Maj8 27.55 -0.18
1st pointy top 310.99 3.98 27.19 28.00 Max-3/32 28.19 -0.19
2nd pointy top 313.38 3.85 28.31 29.12 Max 29.06 0.06
Next top 313.99 3.81 28.59 29.40 Max 29.06 0.34
Basal step 315.13 3.57 28.93 29.75
Intersect dip ish 322.39 3.11 31.95 32.79
Top on slope 331.07 4.10 36.44
Int ish gorse dip 342.92 5.15 41.12

© Michael Wilson 2012-2017.