Baurgorm (W) Five Stone Circle CO118-042 Lat: 51.66
Az Alt AppDec LunarDec Event EventDec Error
Notch 2.73 5.37 43.50
Dip 11.07 4.87 42.15
Hump top 20.68 5.11 40.23
Top 29.49 4.80 36.98
Ax rev dip in ridge 35.49 4.27 34.03 34.88
Dip/notch before trees 35.61 4.25 33.96
Top before trees 37.32 4.37 33.32
Step at trees edge 38.19 4.20 32.78 33.62
NE main low pt ish 48.10 3.42 27.23 28.04
NE main low pt ish 47.75 3.41 27.40 28.21
NE main low pt ish 48.21 3.41 27.16 27.97
NE main low pt ish 48.19 3.43 27.19 28.00
NE main low point ish 48.06 3.42 27.24 28.05
NE main low point ish 48.06 3.42 27.24 28.05
Hump in tree gap 49.17 3.57 26.80 27.61
Notch after trees 61.73 4.00 20.20 20.97 Min8 20.27 0.70
Notch after trees 61.73 4.00 20.20 20.97 SXQ+15 20.60 -0.40
Basal notch 61.85 4.03 20.15 20.92
Next step (upper) 65.18 4.47 18.56 19.32 SXQ+8 18.80 -0.24
Top 68.43 5.16 17.20
Next top 70.51 5.36 16.10
Step base 73.49 5.47 14.38 SXQ-8 14.20 0.18
Next step base 75.31 5.82 13.54
Break ish 79.30 6.60 11.70 SXQ-15 11.60 0.10
Spratt Hill N top 84.44 7.91 9.56
Spratt Hill hump top 86.32 7.96 8.43 EQ/SXQ 8.80 -0.37
Spratt Hill c dip 86.73 7.87 8.11
Spratt Hill S top 90.95 8.23 5.78 EQ+15 5.70 0.08
Spratt top 91.01 8.21 5.72
Break/dip in slope 94.19 7.84 3.47 EQ+8 3.00 0.47
Slope end/top 97.71 7.68 1.20
Next end/top 104.30 6.51 -3.73 EQ-8 -3.30 -0.43
Intersect ish 106.35 6.14 -5.25
L stack/roof 114.76 4.83 -11.25
End/top below trees 128.50 4.69 -18.85 -18.04 WXQ-8 -18.80 -0.05
Top c 128.52 4.71 -18.85
End/top below trees 128.51 4.70 -18.85
Step base 130.35 4.27 -20.17 -19.35 Min+1/16 -19.15 -0.20
End/top/bush over hse 137.94 3.59 -24.43 -23.58 Mid -23.91 0.33
House roof R peak 140.70 3.09 -26.13 -25.28
Near/far intersect ish 144.65 1.92 -28.94 -28.07 Maj8 -27.55 -0.52
Last Windmill base 149.37 1.84 -30.85
Dip after forestry 173.03 2.18 -36.13
Letterlickey cairn 177.71 2.51 -36.07 South 180.00 -2.29
Cairn site 177.78 2.51 -36.07
Letterlickey cairn site 177.74 2.51 -36.07
Dip / pole 190.92 1.05 -36.88
Basal notch 201.44 0.96 -34.75
Far/local intersect 207.15 1.37 -32.56 -31.67
Far/local intersect 207.11 1.40 -32.54 -31.64
Far/local intersect 207.13 1.39 -32.55 -31.66
1st tree/h 208.17 1.52 -32.05
Axial ish 221.42 2.03 -26.20 -25.35
Bungalow R peak 224.60 2.34 -24.41 -23.57
Dip/pole 233.84 1.62 -20.39 -19.59
Dip over axial stone 233.79 1.62 -20.42 -19.61
Dip over axial stone 234.19 1.62 -20.20 -19.40
Dip over axial stone 233.99 1.62 -20.31 -19.51 WXQ-15 -20.50 0.19
Dip 234.09 1.62 -20.26 -19.45 WXQ-15 -20.50 0.24
Pole/bank 242.54 2.47 -14.82
Slope top 243.63 2.60 -14.08 WXQ+8 -14.00 -0.08
House Left 252.19 3.14 -8.61 EQ/WXQ -8.70 0.09
House L peak 252.22 3.34 -8.43
House Right 254.65 3.14 -7.13
Step after yard 261.06 2.13 -4.08
Dip ish pole/h 268.82 2.07 0.66
Middle dip 268.78 2.02 0.59 EQ 0.00 0.59
Middle dip 269.38 2.01 0.95 EQ 0.00 0.95
Middle dip 268.99 2.03 0.73 EQ 0.00 0.73
Slope top 277.83 2.94 6.97 EQ+15 5.70 1.27
Next top 279.83 2.97 8.23
Dip  280.82 2.88 8.77 EQ/SXQ 8.80 -0.03
Slope top 284.13 3.07 10.96
Top (far) 288.41 3.18 13.65 SXQ-8 14.20 -0.55
Hill top 288.46 3.18 13.68
Hilltop 288.43 3.18 13.66
Step/dip 291.96 2.88 15.53
Next step base 298.61 2.42 19.04 19.81 SXQ+8 18.80 0.24
Next step base 298.61 2.42 19.04 19.81 Min+1/16 19.15 0.66
Top 299.91 2.44 19.81 20.58 Min8 20.27 0.31
Dip over N sidestone 302.06 2.10 20.72 21.50 SXQ+15 20.60 0.12
Scart dip 1 302.78 2.10 21.13 21.91 Mid-1/16 21.94 -0.03
Orange box top R 303.40 2.19 21.55 22.34
Top between sheds 303.80 2.22 21.80 22.59 Ssol/SXQ 22.00 -0.20
Dip 304.96 2.14 22.38 23.17 Ssol/SXQ 22.00 0.38
Top (between masts) 305.87 2.20 22.93 23.72 Ssol-15 23.00 -0.07
Top (between masts) 305.87 2.20 22.93 23.72 Mid 23.91 -0.19
1st big step/dip 310.90 2.33 25.73 26.53
Slope top 314.15 2.71 27.73 28.55 Max-1/16 28.67 -0.12
Hump b4 dip. C dip 317.45 2.82 29.45
Step base 317.99 2.80 29.70 30.53 Max 29.06 1.47
Next step/break 319.76 3.02 30.74
Hump top 332.11 4.51 37.30
R pole / dip 344.36 4.98 41.38
Wedge tomb 344.70 5.00 41.48
Tomb Slab c 344.75 5.00 41.49
Wedge tomb 344.72 5.00 41.49
Turf hump over slab 354.08 5.53 43.45
Knocknaveagh top 358.46 5.67 43.85 North 360.00 -1.54
Top 358.47 5.68 43.86
Knocknaveagh top 358.47 5.68 43.86

© Michael Wilson 2012-2016.